Rain Water Harvesting - Requirements
- General layout.
- Remark from Asst. Engineer (Survey).
- Remark from Exe. Engineer (TCE) Tunnel.
- Drainage layout connected to municipal drain or septic tank.
- Storm water drainage layout.
- BServices drawings.
- Contour plan.
- Location of existing or abundant.
No. |
Item |
Condition |
Yield |
Sample |
Remark |
Location of plan |
a) |
Open Wells |
|
|
|
|
|
b) |
Bore Wells |
|
|
|
|
|
c) |
Water Tanks |
|
|
|
|
|
d) |
Fire Water Tanks |
|
|
|
|
|
- One ltr. water of existing bore well / open well.
- Soil strata report.
- Any existing water course flowing through the plant?
- Is there sea near by?
- Is there S. T. P. / E. T. P. Plant requirement?
- Hill / Hillock on site?
- Type of trees.
- Any problem of white ant? Snakes etc?
- Is it a reclaimed land? If yes with what? Garbage or Earth?
- Any existing building.
- Special data, if any.
- Any municipal underground tunnel nearby?
- Municipal approved plan (full set), I. O. D. & C. C.
- Basement details, if any.
- Hydro - Geological Test Report / Porosity Test Report.
- Terrace floor plan with rain water outlet points marked thereon and rain water down take pipe locations marked on ground floor plan.
- Total requirement of water for domestic purpose.
- Total requirement of water for flushing purpose.
- Total requirement of water for secondary purpose.
- Undisturbed soil core sample taken while soil investigation.
M/S. Mungekar & Associates,
Ar. Nandan P. Mungekar
1, Anil Apartment, Gr. Floor.,
M. T. N. L. Road,
Near Agar Bazaar,
Dadar (W), Mumbai 400 028.
Ph. : 022 2422 7512.
Fax :022 2431 2275.
Mob :+91 98690 55711.
Email : mungekar_asso@yahoo.com