Rain Water Harvesting - Requirements

  • General layout.
  • Remark from Asst. Engineer (Survey).
  • Remark from Exe. Engineer (TCE) Tunnel.
  • Drainage layout connected to municipal drain or septic tank.
  • Storm water drainage layout.
  • BServices drawings.
  • Contour plan.
  • Location of existing or abundant.
  •   No.

      Item

      Condition

      Yield

      Sample

      Remark

      Location of  plan

      a)   Open Wells          
      b)   Bore Wells          
      c)   Water Tanks          
      d)   Fire Water Tanks          
  • One ltr. water of existing bore well / open well.
  • Soil strata report.
  • Any existing water course flowing through the plant?
  • Is there sea near by?
  • Is there S. T. P. / E. T. P. Plant requirement?
  • Hill / Hillock on site?
  • Type of trees.
  • Any problem of white ant? Snakes etc?
  • Is it a reclaimed land? If yes with what? Garbage or Earth?
  • Any existing building.
  • Special data, if any.
  • Any municipal underground tunnel nearby?
  • Municipal approved plan (full set), I. O. D. & C. C.
  • Basement details, if any.
  • Hydro - Geological Test Report / Porosity Test Report.
  • Terrace floor plan with rain water outlet points marked thereon and rain water down take pipe locations marked on ground floor plan.
  • Total requirement of water for domestic purpose.
  • Total requirement of water for flushing purpose.
  • Total requirement of water for secondary purpose.
  • Undisturbed soil core sample taken while soil investigation.
M/S. Mungekar & Associates,
Ar. Nandan P. Mungekar
1, Anil Apartment, Gr. Floor.,
M. T. N. L. Road,
Near Agar Bazaar,
Dadar (W), Mumbai 400 028.

Ph. : 022 2422 7512.
Fax :022 2431 2275.
Mob :+91 98690 55711.
Email : mungekar_asso@yahoo.com